You've adopted CSA terminology — but are your teams still running traditional CSV processes? Join PwC to close the gap and unlock true risk-based validation.

What you'll learn

  • Where validation stands today — and what Validation 4.0 requires of your team

  • The real reasons most organizations are stuck at "CSA in name only"

  • Concrete steps to overcome the blockers holding your program back

  • Real PwC case scenarios: how teams reduced effort and scaled validation

Summary

Webinar summary

Many organizations that say they have adopted Computer Software Assurance (CSA) have only relabeled legacy computer system validation (CSV) practices. This webinar shows how to tell the difference and what to do next. PwC US and Kneat speakers cover a five-stage maturity curve, examine the barriers and enablers of CSA, and provide program examples showing time savings.

Key takeaways

  • CSA adoption means less testing scope and documentation, not only new SOP titles and a risk assessment.
  • True CSA sets testing by intended use and criticality, and every document has a purpose.
  • Three barriers reinforce each other: organizational habits, a broken digital thread, and regulatory caution.
  • Four enablers address them: governance alignment, objective criteria, process-based validation, and digital evidence.
  • System logs, audit trails, and automated outputs can serve as primary validation evidence, not only supplements.
  • PwC reported cutting a 10-week testing phase to five weeks on one program by testing end-to-end processes.
  • Systems that are already validated do not need revalidation. Apply CSA at the next change, periodic review, or new implementation.

The maturity curve

  • Stage zero, traditional CSV: heavy documentation, extensive testing, and slow change cycles.
  • Stage one, CSA rebranded: risk assessments exist on paper, but testing scope has not materially changed. The speakers said much of the industry sits here today.
  • Stage two, true CSA: a risk-based, process-driven, evidence-first approach. Testing differs by intended use and criticality.
  • Stages three and four, validation of the future: Validation 4.0 and continuous, agentic validation. The speakers said stage two is the foundation for reaching them.

One company added a risk assessment and exploratory testing to its SOPs. It still required business users to approve technical documentation they did not understand.

Three barriers

  • Organizational habits. Quality, validation, and IT teams work in silos with split decision ownership. On one project, CSV and QA gave conflicting advice on the same change process. The speakers recommend one owner for the full process.
  • A broken digital thread. One client kept requirements in Excel, testing in Jira, and approvals in a separate document management system. Amy Wilhite said digital validation platforms link requirements and executable protocols, but vendor documentation often arrives in Word, on paper, or on a flash drive.
  • Regulatory caution. After an audit finding or warning letter, some companies double down on legacy practices. The speakers said the US Food and Drug Administration (FDA) and European Medicines Agency (EMA) encourage a risk-based approach. They noted the CSA guidance became final in 2025.

Four enablers

  1. Governance alignment. Set a shared validation standard across quality, validation, and IT, with clear decision rights. One client ran five validation procedures with mostly the same content, owned by different groups. The internal message should be a smarter assurance model, not less documentation.
  2. Objective criteria. Structured criteria replace gut feel and set testing rigor by intended use and criticality.
  3. Process-based validation. Assess, test, and document the whole process rather than isolated requirements. Every requirement still gets coverage.
  4. Digital tools as evidence. System logs, audit trails, and automated outputs count as primary validation evidence.

Three program scenarios

The PwC speakers said these scenarios come from one real program, with details generalized. They involve large enterprise resource planning (ERP) and quality management system (QMS) transformations that typically generate more than 1,000 requirements.

  • End-to-end process testing. The team built end-to-end scenarios and concentrated evidence on failure points, instead of scripting each requirement. The speakers reported the testing phase fell from 10 weeks to five. The overall timeline fell from five months to between 3.5 and four months.
  • Risk-stratified data migration. The team split GxP data objects by risk. Master data, such as the material master, got rigorous testing. Transactional data, such as purchase orders, carries a different risk profile. Anirudh Naulay said: “Not all GxP data carries the same risk.” The overall timeline fell from five months to four.
  • Installation qualification (IQ). The team replaced line-by-line configuration checks and screenshots with system transport logs. These logs record who made each configuration change, when, and whether it succeeded. IQ effort fell from five weeks to two.

Three diagnostic questions

  1. Which functions, processes, and capabilities have genuine GxP impact on product quality or patient safety, and can you say so before testing begins?
  2. What vendor evidence already exists, such as assessments, deployment logs, audit trails, and configuration records, before you draft test scripts?
  3. Can you explain to an auditor what you tested and why, and what you did not test and why?

Reported time savings

5 weeks

Testing phase

Down from 10 weeks.

End-to-end process testing

3.5–4 months

Overall timeline

Down from 5 months.

End-to-end process testing

4 months

Overall timeline

Down from 5 months.

Risk-stratified data migration

2 weeks

IQ effort

Down from 5 weeks.

Installation qualification (IQ)

A lot of people think that evidence equals a screenshot. But that’s just one form of evidence.

Amy WilhiteSenior Process Engineer, Kneat

Audience questions

Do systems that are already validated need revalidation when you move from CSV to CSA?

No. Systems that are already validated need no revalidation. Apply CSA principles as change controls, periodic reviews, and incident management arrive, and document in the change control when CSA starts to apply.

PwC’s Quality 4.0 model covers four areas: governance and people, process and procedures, digital toolkit, and analytics.

How do you build confidence in unscripted testing?

Start with a generic, open-ended script, train testers, and define the evidence you expect, such as screenshots, audit trails, and electronic signatures. On a four-wave QMS implementation, testers needed no generic script by the third wave.

Amy Wilhite added that critical thinking is a competency teams may need to prove through training.

What belongs in a validation package under CSA?

Include whatever you can defend to an auditor, with a rationale for what you leave out. The speakers said regulators look for critical thinking, not extra paper.

Can you use your vendor’s documentation as validation evidence?

Yes, if you qualify the vendor. Amy Wilhite said qualifying your vendor lets you use its documentation. She said Kneat averages about 20 new features per release, and only about five touch data integrity.

Speakers

Director, Digital Quality & Validation, PwC US

Sid Pant

Sid is Philadelphia-based director at PwC, specializing in digital quality transformations within the Pharmaceutical and Life Sciences sector. With ten years of experience, he has led validation workstreams for multiple ERP, QMS, and other enterprise-wide digital transformations, managed end-to-end validation activities for clients, and led multiple process transformations to help clients maintain system compliance in a changing regulatory landscape.

Senior Manager, Digital Quality & Validations, PwC US

Anirudh Naulay

Anirudh is a New Jersey-based senior manager at PwC with over eleven years of experience in digital quality transformations across the Pharmaceutical and Life Sciences sector. He specializes in digital quality transformations and validation strategy, having led multiple ERP, QMS and other enterprise-wide application validations.

Senior Process Engineer, Kneat

Amy Wilhite

Amy is a highly experienced validation engineer with a demonstrated history of excellence in the biotechnology industry. She is an expert in laboratory operations, bioprocess manufacturing, and equipment/facility/utility CQV. 

Subscribe now for updates on our upcoming webinars